table Published September 8, 2020 at 4937 × 2905 in FPX Nickel Announces Positive Preliminary Economic Assessment for Baptiste Project with US$1.7 Billion After-Tax NPV, 35-Year Mine Life, 4-Year Payback and C1 Operating Costs of US$2.74/lb Nickel